Actual Portfolio "RENAIO Wasserkraft"


Hydropower plant "Ospedaletto"

The Ospedaletto hydropower plant is located in the municipality of Gemona del Friuli on the Tagliamento River. It is a hydropower plant with an installed capacity of 460 KW. The plant was completed in 2017 and will receive a high feed-in tariff until 2037.

The plant uses a VLH (Very Low Head) turbine from France's MJ2.


Hydropower plant "Zompitta"

The hydropower plant "Zompitta" is located about 10 km north of Udine in Friuli Venezia Giulia on the Torre River. The installed capacity is 600 KW. A Kaplan turbine from Italian manufacturer Zeco is used. The power plant was completed at the end of 2017 and went online on January 1, 2018. The high feed-in tariff of 210 Euro / MWh will be granted until 2037.